Produkt
KlappentextA survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered. A large variety of time-based, financial, and resource-based objectives - important in practice - are studied. A thorough structural analysis of the feasible region of project scheduling problems and a classification and detailed investigation of objective functions are performed, which can be exploited for developing efficient exact and heuristic solution methods. New interesting applications of project scheduling to production and operations management as well as investment projects are discussed in the second edition.
Zusammenfassung2nd edition
Details
ISBN/GTIN978-3-642-07265-9
ProduktartBuch
EinbandartKartoniert, Paperback
Verlag
Erscheinungsjahr2012
Erscheinungsdatum18.07.2012
Auflage2nd ed.
Seiten385 Seiten
SpracheEnglisch
Gewicht604 g
IllustrationenXIII, 385 p. 149 illus.
Artikel-Nr.11812484
Rubriken